Our main production plants directed by Alessandro Barin, are located in China in Taizhou and have an annual production capacity of 1 GW/year.
Our solar panels are produced on a 20,000 m2 site, with a highly automated line, with rigid quality controls implemented throughout the entire process, to guarantee maximum quality and traceability for every single item. We also have another production plant located in Europe.
We have been manufacturing solar panels for over 15 years, which is quite a number considering the relatively young market we operate in.
FuturaSun uses only raw materials of finest quality from renowned suppliers, stored in compliance with stringent criteria for temperature and humidity control.
All production sites are periodically inspected by international accreditation bodies, as further confirmation of the high quality of our production process.