Slide background

ANTICIPATE

TOMORROW

Slide background

ANTICIPATE

TOMORROW

Slide background

ANTICIPATE

TOMORROW

Slide background

ANTICIPATE

TOMORROW

Slide background

ANTICIPATE

TOMORROW

Latest News

FuturaSun at Intersolar Europe 2017

April 26th, 2017|

Come and visit us in Munich at booth 530,
hall A1
Also this year FuturaSun will participate at the most important fair in the solar industry, and with an even bigger booth than last year, we’ll present […]

FuturaSun connects a new 894 kW system to the German grid

January 13th, 2017|

In the last few days, a new 894 kW photovoltaic system developed by FuturaSun, was connected to the German grid in Zirzow, close to Neubrandenburg in the region of Mecklenburg-Vorpommern. The system, installed on […]

FuturaSun at Intersolar India October 19-21

October 6th, 2016|

Bombay Exhibition Center October 19-21, Mumbai
Come and visit FuturaSun at Booth 1524, Hall 1
The combined exhibition and conference event Intersolar has become one of the most important platforms within the worldwide PV industry and now […]


Technical briefings

Delamination

November 11th, 2016|

Delamination of the PV module is the detachment, even if only partially, of the encapsulant from the glass or the backsheet…let’s have a look at the reasons causing it

A PV module has a multi-layer […]

PID – Potential Induced Degradation

November 11th, 2016|

PID is an electrical phenomenon which can cause a power loss in photovoltaic modules.

The problem was first highlighted in 2005, on Sunpower’s cells. Afterwards it was found on modules manufactured with normal cells as […]

LID – Light Induced Degradation

November 11th, 2016|

LID is the degradation of the module arising in the first few hours of exposure to the sun. It particularly affects high efficiency modules. Let’s take a dive into the different aspects of raw […]

Sign up for our Newsletter Subscribe

futurasun

PV systems all over the world use
FuturaSun modules!
View the map

  • Cluj_RO_ground_2700W

    2,7 MWp

    Cluj-Napoca, Romania
    Ground plant
    Modules: FU 250 P

  • Arad, Romania. Ground plants with modules FU 240 P - 4 MWp

    4 MWp

    Arad, Romania
    Ground plants
    Modules: FU 240 P

  • Sardinia_IT_roof_100kW

    100 kWp

    Sardinia, Italy
    Rooftop of a farm building
    Modules: FU 285 P

  • Vicenza_IT_residential_13kW

    13 kWp

    Vicenza, Italy
    Residential roof
    Modules: FU 230 P

  • Mantova_IT_roof_500kW

    500 kWp

    Mantova, Italy
    Rooftop of a farm building
    Modules: FU 260 P